Completed Projects
TNB Hydroelectric Power Station
(Sultan Idris Power Station, SJ Woh)
![](http://marshallengineering.my/wp-content/uploads/2022/08/Picture1-1.jpg)
![](http://marshallengineering.my/wp-content/uploads/2022/08/Picture2-1.jpg)
Manpower supply for Rotor Repair Works
Completion Date: April 2020
25MW Solar Farm
(UiTM Pasir Gudang, Johor)
![](http://marshallengineering.my/wp-content/uploads/2022/08/Picture3-726x1024.png)
Installation of Panels
Developer: SPIC Energy (Malaysia) SB / UiTM Solar Power Dua SB
Completion Date: November 2020
50MW Solar Farm
(Gambang, Pahang)
![](http://marshallengineering.my/wp-content/uploads/2022/08/Picture4-871x1024.png)